法马利康市政市场于 1952 年 9 月 21 日开放,它的建设具有双重目的:一方面缓解旧展览场地(现在的D. 玛丽亚二世广场)的拥挤,另一方面创造有着更好的卫生条件的宜人空间。在经历了一段黄金时期之后,在干预之日,市场将自己展示为一个过时的空间,没有动态能力来吸引多样化的新消费者。

Opened on September 21st of 1952, the construction of the Famalicão Municipal Market had a dual purpose: on one hand to decongest the old fairgrounds (nowadays D. Maria II Square) and on the other hand to make a more pleasant space with better hygienic conditions.After a golden period, the Market presented itself, at the date of the intervention, as an obsolete space without a dynamic capacity to attract new and diversified consumers.

主楼由三个连续的矩形主体组成,带有一个拥有城市徽章的炮塔,标志着D. 玛丽亚二世广场和曼努埃尔卡瓦略船长街之间的过渡。在较高处,通过两个入口进入市场的庭院(广场)。向北,靠近曼努埃尔卡瓦略船长街,向西,靠近D. 玛丽亚二世广场。

The main building consists of three contiguous rectangular bodies, with a turret that bears the City’s coat of arms, which marks the transition between D. Maria II Square and Capitão Manuel Carvalho Street.At a higher elevation, the access to the Market’s courtyard (Square) is made through two entrances- to the North, by the captain Manuel Carvalho Street and to the West, by the D. Maria II Square.

低层的庭院由三座出售肉、鱼和水果的建筑物支撑。在建筑项目中得到维护和修复的主体体积在蓝图中形成了一条折线,但在更高的层次上,它与街道正面相伴。内部空间被几个商业机构(街边商店)占据。

The courtyard, at a lower level, was supported by three buildings in which was sold meat, fish and fruit. The main volume, which was maintained and rehabilitated in the architectural Project, takes form of a broken line in blueprint, but in a higher level it accompanies the street front. The interior spaces are occupied by several commercial establishments (street stores).

对法马利康市政市场的干预旨在对其进行修复,前提是增强其建筑特色并改善现有条件。因此,除了对现有建筑进行干预外,还建造了一个新的金属结构,以确保能够满足永久和周期性市场的需求。同时仍然允许向温贝托·德尔加多元帅大道和穆济尼奥德开放新的城市前线——阿尔伯克基广场。

The intervention on the Famalicão Municipal Market aimed its rehabilitation, with the premise of enhancing its architectural character and improving the existing conditions.Thus, in addition to the intervention on the existing building, a new metallic structure was built, guaranteeing the ability to meet the needs of the permanent and cyclical Market and still allow the opening of a new urban front to Marechal Humberto Delgado Avenue and Mouzinho de Albuquerque Square.

这个新建筑的外部涂层保

证了空间的遮阳和防水,并参考了现有的炮塔三角形模块,使之与周围环境更好地融合。

The coating of this new body guarantees the shading and waterproofing of the space and has as reference the pre-existing triangular module of the turret, which also allows a greater integration in the surroundings.

▲平面图

▲立面图

 

▲施工细节图

项目信息——

项目名称: 法马利康市政市场修复项目

项目团队:法马利康市城市设计单位

主创建筑师:瑞·里贝罗

项目地点:法马利康,葡萄牙

完成时间:2021

项目面积:374820 

摄影: 伊沃·塔瓦雷斯工作室

Project Information——

Project Name:Vila Nova de Famalicão Atelier de Arquitectura

Architecture Firm:Unidade de Projeto Urbano do Município de Vila Nova de Famalicão

Main Architect:Rui Ribeiro

Completion Date:2021

Gross Built Area:374820㎡

Photographer:Ivo Tavares Studio


本文已获授权,由Hi设计—LIU NI编译整理,如需转载请注明出处,署名作者。本文图片及视频等资料来自Rui Ribeiro, Arq.